It's holidays. I am off to Perth for a couple of days as I have a funeral to go to. House is zooming along. The tiler is in atm doing wet areas. Hopefully he'll be finished by sometime next week. Then the electrician and the plumber are due to return. Things still to be done:
bricks cleaned, site clean
leech drains to go in
insulation in roof and a manhole cover to be added
final paint coating on doors and door frames
External painting
garage door
final plumbing
final electrician
Had to believe it is going to take another 6 weeks for it all to be done.
But we were told late May /beginning of June as possible handover. I kept thinking it was at least 2 months away but it's not. We've been "window shopping" I guess you would call it. getting quotes for blinds and carpets.
So many decisions to make. We need to get quotes for paving, retaining walls.
It looks like we've picked our venetian blind colour. Every place we went into yesterday and on Saturday we picked the same colour. So our Venetian blind for the kitchen will be a colour called "grey sparkle." ATM we are having verticals for the dining and games sliders and for the window in the games room and going for holland blinds for office, lounge, and bedrooms.
The verticals will be a mind range colour called 'expresso" or a metallic copper colour depending on who we go through.
We've gone from having blinds to match to looking at lighter coloured blinds for most rooms now and a dark charcoal or a black for the lounge. originally we had considered roman blinds for the office and main bedroom but jsut can;t afford them. So it looks like we might just have nicer blinds for the main bedroomand lounge and have cheap ones for the office and minor bedrooms.
To soften the look and to add privacy we'll be adding sheers over the top for bed1,lounge and the office. I've talked Hubby into adding a scarf valance look as well just for our bedroom windows in the same sheer. (hoping they will be big enough to do so)
We've also been carpet browsing. We were drawn to a wool carpet for the main bedroom and lounge but it looks like we might end up with a SDN carpet now because we've changed to a darker carpet for the main bedroom and lounge and from teh carpet place we preferred in our price range the colours were not as nice in the wool carpets. ( 2nd best quote had nicer wool carpets but we couldn't find a carpet we liked that suited bedroom1 and the lounge. ( they are so close it needs the same carpet or 2 variations of it if a textured carpet) .We've been to 3 places so far and the quotes have ranged from 7, 400 to 9, 500. Not the same carpet with each place and not the same underlay. My preferred underlay was at the place with the most expensive quote but they didn't have as big a range of carpet to choose from. The best range of carpets was at a place where I didn't particularily like the sales guy. It was also the best price. But only by a small amount. The other quote had some lovely carpets but we couldn't match them together the way we could at the best quote place. ( going for a similiar tone) I think the office carpet from them is the most practical and hardwearing though. IT"S all too hard!
This blog is for family and friends so they can watch as we settle in a new town with a newly built house and turn it into a home, establish gardens and settle in. Come and join us and follow the progress. I will try and include lots of photo's along the way.
Wednesday, April 15, 2009
Friday, April 10, 2009
Little steps


Happy Easter Readers. I hope you get to enjoy some special time with family and friends over the break.
I'm on holiday for 2 weeks and hoping by the end of it the tiler will be finished and there will be more to report.
Went up as soon as it was light enough today to see in through the windows to see what I could see.
On Tuesday the open pit was filled with concrete. I can only assume there was rock deeper down and they've not been able to dig as deep as they normally would and so have covered the cables with concrete to protect them. The phone man "R" was due at the house on Wednesday to connect the cable left by the electrician at the corner of the house up into the house and through the ceiling into the office. This has now been done. I could see the little wall jack through a gap in the plastic paint sheeting over the office window. There is also a conduit up the garage wall with a telstra (phone company) box attached to it.
Round the back of the house I was able to peek through a bedroom window and see up the passageway towards the main bathroom. 3/4 of the bathroom floor has now been tiled. Also the Linen slider doors were resting on the wall in the bedroom.
Monday, April 6, 2009
In the trenches
Went up to take a photo of our half filled trench from the street for electricity and water as well as, it seems, a conduit for something? Rang the phone guy "R" to let him know the trench has been opened and he is now coming on Wednesday to put in the phone connection. They seem to have filled half the trench back in. At least there are no huge rocks lying about so we shouldn't get a bill for rock removal. That's why the photo was taken. We have the evidence. :)
Our last worry/ hurdle with earthworks additional bills. phew. . Phone guy "R" was all set to terminate it in the kitchen! arghh.. obviously doesn't have house plans or details from the builder. He asked hubby who we were building with. anyway he now knows, we hope, where to terminate the phone line in the house.

Spoke to the tiler "D" today to let him know the phone guy would be calling in on Wednesday. Since I had my camera with me I had a quick look around.
Main loo has a clean float floor ready for tiling and he's almost finished doing the same in the main bathroom. The hobs for the main bathroom shower and under the bathroom cabinets are done. He's made a start on the ensuite tiling. Just the wall tiles in the shower atm. I can see something green on the walls. I assume it's waterproofing.
Our last worry/ hurdle with earthworks additional bills. phew. . Phone guy "R" was all set to terminate it in the kitchen! arghh.. obviously doesn't have house plans or details from the builder. He asked hubby who we were building with. anyway he now knows, we hope, where to terminate the phone line in the house.

Spoke to the tiler "D" today to let him know the phone guy would be calling in on Wednesday. Since I had my camera with me I had a quick look around.
Main loo has a clean float floor ready for tiling and he's almost finished doing the same in the main bathroom. The hobs for the main bathroom shower and under the bathroom cabinets are done. He's made a start on the ensuite tiling. Just the wall tiles in the shower atm. I can see something green on the walls. I assume it's waterproofing.
Saturday, April 4, 2009
And now we wait
Wednesday, April 1, 2009
Tiler
We had a meeting with the tiler tonight.
A young guy who seems keen to do a good job. he suggested mitre joins for tile corners. He also explained how he preferred to finish off tiles by sanding cut edges rather than flipping tiles to keep cut tiles looking good and discussed the pro's of having a 4 way slope in tiles to the shower drains as being more efficient. So our shower based will be tiled in a diamond pattern. He explained about sealing the shower joins after cleaning with appropriate coloured sealer. etc. We'd explained that in the current rental someone had sealed the grout with something to match the floor grout or had used floor grout colour ( brown) in the joining edge of the entire wall section with the rest of the grout being cream. phew .. he's not going to do that. we've agreed to pay the additional $25 dollars per shower for this as we think it's a better idea and to pay the additional cost for mitre joins on tiles. ( approx an extra 200-220)
He said it would normally take him about 2 1/2 weeks but with easter he expects it will be about 3 weeks. he also said something about it usually being about 2 months from when he finishes work 'til hand over. arghh
Hopefully not that long.
Also finished: Our garage hardstand floor has been poured and the kitchen granite is in. :)
The granite is very dusty of course but I am thrilled with it.



This is it with our black splashback tiles. they are very shiny . I couldn;t get a good photo to show it. But they are completely smooth plain ceramic tiles. We wanted the granite to be the feature not the splash back.

The red arrow is pointing to the join in the granite. From standing height it's not that visible but up close it is.
A young guy who seems keen to do a good job. he suggested mitre joins for tile corners. He also explained how he preferred to finish off tiles by sanding cut edges rather than flipping tiles to keep cut tiles looking good and discussed the pro's of having a 4 way slope in tiles to the shower drains as being more efficient. So our shower based will be tiled in a diamond pattern. He explained about sealing the shower joins after cleaning with appropriate coloured sealer. etc. We'd explained that in the current rental someone had sealed the grout with something to match the floor grout or had used floor grout colour ( brown) in the joining edge of the entire wall section with the rest of the grout being cream. phew .. he's not going to do that. we've agreed to pay the additional $25 dollars per shower for this as we think it's a better idea and to pay the additional cost for mitre joins on tiles. ( approx an extra 200-220)
He said it would normally take him about 2 1/2 weeks but with easter he expects it will be about 3 weeks. he also said something about it usually being about 2 months from when he finishes work 'til hand over. arghh
Hopefully not that long.
Also finished: Our garage hardstand floor has been poured and the kitchen granite is in. :)
The granite is very dusty of course but I am thrilled with it.



This is it with our black splashback tiles. they are very shiny . I couldn;t get a good photo to show it. But they are completely smooth plain ceramic tiles. We wanted the granite to be the feature not the splash back.

The red arrow is pointing to the join in the granite. From standing height it's not that visible but up close it is.

Subscribe to:
Posts (Atom)